Description

Segmental Balanced Cantilever Concrete Bridge Form Traveler Method

Form Traveler is used Balance Cantilever Construction Method. Segmental Balanced Cantilever Concrete Bridge Form Traveler Method is easier to be use compare to Under Slung Model. And it is easier to be modified for future usage. Our Segmental Balanced Cantilever Concrete Bridge Form Traveler Method are with good quality modular connection, designed for future modification and repeated usage for many years. We supply good quality metal formwork. We also provide plywood formwork system as it is a more economical solution.

Concreting Support, self-launching operation, level adjustments are all by means of hydraulic system. Erection of the Segmental Balanced Cantilever Concrete Bridge Form Traveler Method on the pier top can be as short as 1 week. All major parts join together by pin connection, which promises speedy erection and high accuracy design.

Item
Description

Specification

1

Model

FT-S

2

Capacity

100t ~ 480t

3

Segment Length

3.5m ~ 7.0m

4

Deck Width

5m ~ 35m

5

Bridge Curvature Radius

100m-unlimited

6

Bridge Type

Balance Cantilever Box Girder or Cable Stay

7

Launching Mechanism

Hydraulic

8

Formwork Material

Metal Sheet or Plywood Sheet

9

Shape of Bridge Section

Any shape

10

Production Cycle time

5 days – 7 days depend on site condition, concreting capacity, concrete design, pier height, reinforcement fabrication method etc.

11

Max. Bridge Slope

Longitudinal

7%

Transverse

5%

Segmental Balanced Cantilever Concrete Bridge Form Traveler Method

Huada Heavy Industry is a big enterprise specialized in researching, developing, producing and exporting.

It mainly produces overhead crane and gantry crane, beam launcher, movable scaffolding system crane, Segmental Balanced Cantilever Concrete Bridge Form Traveler Method, straddle carrier, tyre transportor, beam trolley, portal crane and electric winch, electric hoist and all kinds of accessories, which widly cover machinery, metallurgy, electric power, railway, water conservancy, ports, terminals and other industries.

Huada Heavy Industry have more than 600 staff, and covers 200,000 square meters.

Our advantages:
A. More than 50 R&D personnel with advanced Science and technology.
B. More than 400 sets advanced Production processing equipment and inspection equipment.
C. Independent intellectual property rights to develop energy saving bridge cranes, gantry cranes, and electric hoist.
D. Obtain ISO 9001 certificate and more than 10 series of patent certificates.
E. Efficient service and competitive products.
F. Export more than 100 countries.

Packing

1. Hydraulic parts are packed by high quality plywood crate to reduce distortion.
2. Structure are packed by plastic woven cloth to reduce abrasion during transporting.

Delivery

1. If the size of Segmental Balanced Cantilever Concrete Bridge Form Traveler Method are suitable for container ship, usually by container.

2. If the size is too big, usually by bulk ship or by container after disassembly.

3. Transport ways are based on reducing cost and keep the Segmental Balanced Cantilever Concrete Bridge Form Traveler Method performance.

Delivery time
Could be deliveried within 30 to 40 days after the receipt of deposit.

Transportation
Generally 35 days to 50 days to destination port.

Segmental Balanced Cantilever Concrete Bridge Form Traveler Method

Huada Heavy Industry Segmental Balanced Cantilever Concrete Bridge Form Traveler Method is designed for safety.
Emergency stop button, Limit switch, sensor are located at designated location. Lighting and spare-parts are part of the items coming with Segmental Balanced Cantilever Concrete Bridge Form Traveler Method.

Segmental Balanced Cantilever Concrete Bridge Form Traveler Method

1. 12 months warranty after installation and commissioning in addition to the human damage factors.
2. 1 year spare-parts provided for better maintenance.
3. Professional technical staffs provide installation, commissioning and training services. The installation team can be sent to local site to install for customer.
4. Delivery with English user manual, parts manual, product certification and other relevant certificates.
5. Technical advisory for any time.
6. Test before shipment.
© 2005-2020 Bikudo Privacy PolicyTerms of Service