truss type bridge construction launching gantry crane

truss type bridge construction launching gantry crane

by Huada Heavy Industry
China | Manufacturer | Call: 86-373-5089978
OriginChina
Warranty1 year
CategoryMachinery
Product groupGantry Cranes
Bikudo Id831563

Description

Product Description
Truss type bridge construction launching gantry crane for bridge construction is generally used in the erection of the Highway Bridge and Subway Bridge, using the precast segmental pre-stress concrete box beam (PC beam) assembly.

The main feature of truss type bridge construction launching gantry crane is the high efficiency of construction and self-traveling. Generally it is composed of the main beam, leg and winch trolley, the main girder is used for bearing, the leg is to execute machine transverse moving, longitudinal moving, leveling, support, cross span, cross scale and other functions, and the winch trolley used for lifting the precast girder.

Packing & Delivery
Packing
1. Electric and hydraulic parts are packed by high quality plywood crate to reduce distortion in conveying;
2. Main beams, end beams are packed by plastic woven cloth. It can reduce abrasion when transport.


Delivery
1.If the size of truss type bridge construction launching gantry crane are suitable for container ship, usually by container;
2.If the size is too big, usually by bulk ship or by container after disassembly.

Transport ways are based on reducing cost for you and keep the crane performance.


Transportation
Generally 35 days to 50 days to destination port.

FAQ
1.What’s the information should I provide when inquiry about the truss type bridge construction launching gantry crane?
a .we need the Bridge Drawing; the Maximum longitudinal slope and the Maximum Transverse slope;
b. The Girder/beam drawing;
2.How many Personnel and equipment to assemble launching gantry in the worksite we need?
Personnel: 8 to 10 workers equipment:
Truck crane>50t :2 sets
Φ19.5 steel wire rope 8m:4 ropes
Sleepers:several
Electric welding machine:1set
Oxygen, acetylene:1 set
Hammer(12pound and 8pound):1 set for each
Wrench and pincher:several
Gradienter:1set
3.What are inspection standard for load test of truss type bridge construction launching gantry crane?
a. Dynamic load test
1.1 times rated load, main girder does not down deflection, all mechanisms work well, performance parameters meet the design demand, all limit switches and safety protection interlock devices are reliable, all spare parts does not have cracking and flexible connection, all motors and contactors are not overhead.
b. Static load test
1.25times rated load, all mechanisms work well, the crane stops 20min to 30min as trial load is lifted 10cm high, then measure main girder down deflection(theodolite, ruler). Put down trial load to measure main girder upper camber, repeat 3 times, steel structure does not have permanent deformation.
4.How to make highway bridge concrete girders?
a.Full span prefabrication,
b.Segment girder prefabrication
c. Full span cast in place girder
d. Segment cast in situ
5.How about maintenance of 800 ton segment china launching gantry equipment for bridge construction?
a. Lubricating. b. Steel wire rope. c. Spreader d. Pulley blocke.Wheels f. Brake